
Central Railway will operate special traffic blocks at Lonavala including station and yard lines for commissioning of Electronic Interlocking (EI). The blocks will be operated from 27.10.2021 to 30.10.2021. However,… Read more

Ministry of Railways will shut down IRSDC and hand over station redevelopment back to zones Read more

जबलपुर स्टेशन को आकर्षक रोशन दिखने के लिए विभिन्न प्रकार की लाईट्स का उपयोग Read more

Engineering works are being carried out for Commissioning of Double Lines between Bhalwani – Washimbe railway stations Read more

राजकोट मंडल दोहरीकरण कार्य : ट्रेनें आंशिक रूप से रद्द Read more

PM GatiShakti will eliminate silos in the planning and design of projects and will address past issues through holistic planning, expects the government. Read more

Train No. 02711 Vijayawada – Dr. M.G.R Chennai Central Pinakini Superfast Special train of 19th and 26th October, 2021(2 days) is partially cancelled between Gudur and Dr. M.G.R Chennai Central Read more

Electrification work will save foreign exchange reserves spent on HSD Oil, and will provide greener transportation & reduced carbon footprints. Read more

As part of doubling, at Madgaon, one new crossover has been laid with total 163 signal routes. Read more