CR: Wardha Bhusawal Passenger Speeded Up

Speeding up of 51198 Wardha-Bhusaval Passenger

Central Railway will revise the timings of 51198 Wardha-Bhusaval Passenger and speed up by 40 minutes with effect from 17.1.2020.

51198 Passenger will leave Wardha at 23.40 hrs instead of 23.00 hrs as at present and arrive Bhusaval at 08.00 hrs as at present.  The timings are revised between Wardha and Badnera.  There is no change in timings of this train between Badnera and Bhusaval.

Related Posts

Got something to say? Post a comment!