CRS nod for ER’s Ratanpur -Jamalpur doubling

Commissioner Railway Safety (CRS)/Eastern Circle inspected doubling work between Ratanpur – Jamalpur (6.35Km) of Eastern Railway’s Malda division on Sunday.

This is the last patch of south approach of Munger- Ganga rail cum road bridge Project.Speed trial was done up to a speed of 125Kmph. Commissioner Railway Safety (CRS) accorded all important authorization at speed of 90 Kmph.

The section consists of a 341 metre long lined horse shoe shaped tunnel.

Works involved modification of 300 out of the 543 routes at Jamalpur Route Relay Interlocking (RRI) besides new Electronic  Interlocking of Ratanpur.

Related Posts

Got something to say? Post a comment!Cancel reply

Exit mobile version
%%footer%%