Doubling and Electrification Commissioned on Donakonda-Gajjelakonda section of Guntur-Guntakal Line

South Central Railway has commissioned the doubling and electrification works completed between Donakonda and Gajjelakonda on the Guntur-Guntakal route. With the commissioning of this stretch, work on 81 km of the total route has been completed.

The Donakonda – Gajjelakonda stretch is 12.4 km in length and was commissioned yesterday, 1st April 2021. Speed trial inspection was completed by the Commissioner of Railway Safety and an initial maximum permissible speed of 90 kmph has been allowed.

Doubling & electrification between Nallapadu – Satulur (32 km) and Dhone – Pendekallu- Edduladoddi (36.6 Kms) has already been completed and commissioned. With 81 km of doubling works with electrification complete, work on the remaining section continues. 

The Guntur – Guntakal Section is a vital rail link connecting the coastal belt of Andhra Pradesh State with the Rayalaseema region and beyond the south. In order to provide seamless transportation and ease the congestion on this section, Guntur – Guntakal Doubling & Electrification project was sanctioned.

As part of the Donakonda – Gajjelakonda doubling works, a centralised Electronic Interlocking system has been provided at Donakonda and Gajjelakonda stations for efficient handling of the trains.

Key Benefits

  1. Potential for running more number of trains between Guntur-Guntakal, particularly from Hyderabad/Nadikude side towards Rayalaseema region and beyond down South.
  2. Improves freight transportation by harnessing the potential of mineral-rich Palnadu Region to transport its produce/goods to any part of the country.
  3. Doubling of this section enhances overall train handling capacity in the Guntur/Vijayawada region, with the possibility of diverting more trains via Guntur to balance the rail traffic and reduce the congestion on the Grand Trunk route.

Related Posts

Got something to say? Post a comment!Cancel reply

Exit mobile version
%%footer%%