SR: Changes to Services Due to Line and Power Block Between Chennai and Arakkonam

According priority to Passenger Safety and safety of train operations as a part of ongoing Engineering works, Line Block / Power Block is permitted in Chennai – Arakkonam Section between Pattabiram East Yard and Pattabiram Military Sidings E-Depot from 11th December 2019 to 12th December 2019 at 22:40 hrs to 03:10 hrs (4 Hours 30 Minutes). Details of repercussion of train services are given below.

EMU TRAIN SERVICE FULLY CANCELLED ON 11TH DECEMBER 2019

1.            Train No 43892 – Pattabiram Military Siding E-Depot – Avadi EMU local leaving PTMS E-Depot at 23:55 hrs is fully cancelled.

EMU TRAIN SERVICES PARTIALLY CANCELLED ON 11TH DECEMBER 2019

1.            Train No 43132 Pattabiram Military Siding E-Depot – Moore Market Complex EMU local leaving PTMS E-Depot at 22:45 hrs is partially cancelled between PTMS E-Depot and Avadi.

2.            Train No 43127 – Moore Market Complex – Pattabiram Military Siding E-Depot EMU local leaving Moore Market Complex at 22:35 hrs is partially cancelled between Avadi and PTMS E-Depot.

3.            Train No 43799 – Velachery – Pattabiram Military Siding E-Depot EMU local leaving Velachery at 22:30 hrs is partially cancelled between Avadi and PTMS E-Depot.

Related Posts

Got something to say? Post a comment!Cancel reply

Exit mobile version
%%footer%%