Built Vital Infrastructure During Pandemic: Western Railway on FY21 Achievements

Making good use of the low traffic period during the lockdown, Western Railway has completed several infrastructure renewal and maintenance works in FY 2020-21 Read more

Bridging the Palk Strait Again: The New Pamban Bridge to Rameswaram

As the old rail link to Rameswaram begins to show its age, Indian Railways has already begun work on a new, taller, double line railway bridge alongside to replace it. Read more

SCR: Work on 23 Bridges Carried Out Between April and June 2020

Work on several bridges was taken up by South Central Railway taking advantage of low traffic conditions on high density routes between April and June Read more

How Floods in North Bihar Disrupted Rail Operations Over 120 Years – Part 1

A look back at how floods have regularly disrupted railway operations in North Bihar over the past 120 years Read more

CR : Major Traffic Block on Sunday, 26th July

All suburban services will remain suspended between Chhatrapati Shivaji Maharaj Terminus and Kurla during the block period. Read more

Central Railway Rebuilt, Fixed Bridges at 33 Locations During Lockdown

Central Railway utilized the low traffic conditions during the lockdown to rebuild and fix 33 bridges across the network Read more

Ten Bridges on NCR Get Water Level Monitoring System, Improved Safety

Bridge Water Level Monitoring System has been installed on ten bridges by North Central Railway to improve safety of trains passing over the bridges Read more

SER Gears Up Track Maintenance & Safety Related Works During Ongoing Monsoon

Railway tracks are being inspected at regular intervals to ensure that every section is fit for train operation Read more

SWR Rebuilt 4 Bridges On Londa – Miraj Railway Track In Lockdown Period

As only limited number of special trains in selected routes, goods and parcel trains are running now, turning adversity of lockdown due to an opportunity, SWR has reconstructed has many… Read more

ER Dismantles 2 Protection Bridges Of Eastern Coalfield Between Andal and Raniganj

On 7.6.2020, with the help of 140 tonne Rail crane, two old dilapidated protection bridges of Eastern Coalfield Ltd., (viz. J K Ropeway) used for carrying sand at Baktar Nagar… Read more