
New AC ‘Economy’ Class: 144 Coaches to Roll Out in FY 20-21, Overall Production Plan Scaled Down 41%
Indian Railways has scaled down production of coaches by 41% this year according to its revised coach production programme. Read more

Indian Railways has again floated a tender for supply and manufacture of Train-18/Vande Bharat trainset at ICF, RCF and MCF. Details inside. Read more

Vande Bharat tender process cancelled because two packet system was not followed by bidders, retendering in a week, Chairman, Railway Board clarifies Read more

ICF to lose monopoly on production of Vande Bharat trainsets as CRB announces RCF and MCF will also take up production Read more

The Rail Coach Factory at Kapurthala has come up with a modified coach design to reduce the spread of COVID-19 infection in trains. Pictures and details inside Read more

A total 3744 employees have been permitted to join the work who are residing inside the RCF premises township. Two coaches have been turned out in two days. Read more

RCF built first-ever High Capacity LHB Parcel Van capable to run at 130 kmph & 24 Ton total carrying capacity was introduced in New Delhi today. Images inside Read more

In a twist, the Ministry of Railways is considering a proposal to create two PSUs instead of the originally planned one PSU to take over the Indian Railways' production units. Read more

Indian Railways (IR) has decided, as part of its 100 Day Plan, to conduct a detailed study on the hiving off and corporatization of its production units into a separate… Read more

Shri. BG Mallya (IRSEE), presently working as Chief Electrical Locomotive Engineer/SCR has been transferred to SWR as Principal Chief Electrical Engineer (PCEE) (Co-ordinating HOD). Shri. Prem Chand (IRSEE), presently working… Read more