Central Railway will operate traffic and power block on Up slow, Up and Down fast lines and on 5th and 6th lines lines between Vikhroli and Mulund stations for launching of girders by road crane at kms 28/06 from 01.00 hrs to 04.30 hrs on 11.4.2021 (intervening night of 10/11.4.2021).
Due to this block, the train running pattern will be as under:
Following Up Special trains will be regulated at Thane/Mulund and arrive destination behind schedule by 20 minutes
02810 UP Howrah-CSMT special JCO 9.4.2021
01134 UP Mangalore Jn-CSMT special JCO 10.4.2021
01020 UP Bhubaneshwar-CSMT special JCO 9.4.2021
02541 UP Gorakhpur-LTT Special JCO 9.4.2021
08519 UP Vishakapatnam-LTT Special JCO 9.4.2021
Passengers are requested to bear with the railway administration for the inconvenience caused due to this infrastructure block.